Blue Energy’s Jake Jurewicz joins Alex Krutz to discuss small modular reactors, faster nuclear deployment, and the energy capacity needed to power American industry.


The Factory Doctor podcast cover featuring Blue Energy’s Jake Jurewicz and host Alex Krutz, discussing nuclear power and U.S. energy security.

Alex Krutz: All right. Welcome, everybody, to The Factory Doctor podcast. I’m here with Jake Jurewicz of Blue Energy, the CEO there. Jake, welcome to the show.


Jake Jurewicz: Thank you, Alex. Great to be back.


Alex Krutz: It’s great to see you. It’ll be interesting for people to know that I met you last year when I was in my Deputy Assistant Secretary for Manufacturing role, and I got to spend a lot of time around nuclear companies. You and your team, with Cody and CJ and the rest of the team, I actually met and talked to them in, of all places, Vienna, Austria, at the nuclear conference that was there, the IAEA conference. It was great. Again, welcome to the show. We’re really happy to have you here.


Jake Jurewicz: Thank you. Excited to be on.


Alex Krutz: Obviously, you’re in that startup mode. It would be great for you to talk about where you’re at in your Series B. Maybe tell everybody a little bit about your background and what you’re doing with the company so they can get to know you.


Jake Jurewicz: By way of background, I grew up outside of Chicago near the Wisconsin border. I grew up in the construction industry. I used to be a construction draftsman for my father’s architecture firm growing up. I grew up around a lot of construction sites, mostly single-family homes around Chicago, but a few bigger projects downtown, part of the hospital system, part of the lab schools.


Then I went to MIT, studied nuclear engineering and physics, spent two years in fusion research and development with the team that later became Commonwealth Fusion Systems, and then did my thesis work on this concept of shipyard manufacturing applied to nuclear fission as a way of reducing cost and schedule.


Then I joined Exelon Corporation. I spent six years on the corporate strategy team at Exelon in Chicago working on all things early-stage energy tech investment, R&D, venture capital. I did a lot in hydrogen, batteries, advanced nuclear, solar, wind, gas technologies, really across the energy system in different parts of the country.


When Exelon and Constellation split apart, I left and started a development company that did behind-the-meter development in Texas. That turned into a data center project with a company called Crusoe. I got to know that team really well through that experience. At the same time, I joined a startup out of the U.K., kind of as an excuse to go and explore the European energy sector.


I got involved there just in time for Russia to invade Ukraine and Nord Stream 2 to blow up. The energy crisis in Europe unfolded, and that was really the big macroeconomic signal for me. I could see that the energy system had fundamentally changed for the next several decades. Energy security was going to become paramount, and you started to see this wave of pro-nuclear sentiment travel through different governments throughout the world.


I couldn’t help but notice I was living near a nuclear shipyard and thought I should revisit this concept from MIT to look at what it would take to prefabricate a nuclear power plant. Really take the lessons learned from offshore oil and gas, particularly from how LNG export terminals have been getting built recently, to prefab everything and barge it to the site and enable faster build and lower-cost financing so we can accelerate the schedule of nuclear deployment.


That was really the impetus for founding Blue Energy, which I co-founded and am now the CEO of. It’s kind of a reunion of some of that MIT research team, some of my former Exelon colleagues, and a lot of people have gotten involved in it very quickly. Because the core issue that we’re trying to address is really the main issue that’s been holding nuclear back. It’s cost and schedule.


How do you build a nuclear plant on time and on budget, on a timescale that is relevant to addressing the energy crisis that we’re having right now? Doing so really unlocks the market globally for nuclear power to even be sold to U.S. allies and others.


The big milestone we just hit, which you alluded to, is we just announced a $380 million Series B financing that allows us to really start to accelerate things on the first project.


Alex Krutz: That’s great, and congratulations on that. I know that you also signed some great partnerships with GE Vernova and some other great companies. You guys are on a scale path.


Before we start getting into things, can you help people understand a little bit about what an SMR is? Maybe what the difference is between what we call those traditional large nuclear reactors that everybody has in their mind, and what that means about prefabbing. We’ll get into this later, but generally, what does that mean about prefabbing, doing an SMR and taking that? We can talk about that a little bit more.


Jake Jurewicz: Nuclear plants historically have trended toward larger and larger sizes. A lot of the nuclear plants, the last wave of nuclear plants we built, are on the order of a gigawatt plus. They’re very large, complex pieces of civil infrastructure. The ones that we’ve been building most recently have been $30 billion projects. It’s like building an international airport. It’s a huge civil engineering project.


There’s been this movement toward this concept of a small modular reactor, or an SMR for short, and it’s very blunt with its name. The idea is, rather than going bigger with the reactor and trying to lean on economies of scale of size, can you go the other way and say, “All right, what have we gotten good at building?”


Rather than doing a construction process, can we do more of a manufacturing process and standardize it, make it small, make it modular like Legos, and really drive economies of mass production to drive down cost and accelerate deployment? That’s what we’ve seen happen with other types of power generation as well.


That’s what a small modular reactor is. It’s really just a shrunken-down version of the reactors we’ve been operating for 70 years so that we can deploy it faster. It’s a much smaller dollar amount. You don’t have to swallow a $30 billion project all at once. You can do it in more bite-sized pieces.


It’s small enough that you can rethink the way that you build it. That’s what we really leaned into at Blue Energy. These small modular reactors that have been under research and development for many years and going through licensing with the NRC, they’re actually small enough that we can revisit the entire paradigm of how we build the plant.


We can borrow a lot more lessons and best practices from shipbuilding and offshore oil and gas and the LNG plants. It’s still fairly large construction, but it allows you to follow a prefabricated model where you can do so much more of the work offsite in a factory-like environment with higher quality assurance. You shrink the amount of risk and construction scope onsite, and it ends up sometimes cutting the schedule in half if you do it right.


Alex Krutz: When you get economies of scale, then you can put things on order that are more predictable, your supply chain’s stronger, and then you have repeatability and productivity within your production environment.


When I learned about it last year, and that’s the first time I really learned about it in my manufacturing role, it was an amazing concept to really understand how that works.


As we get going here, we’ll come back to some of the technology and jump more into that, but tell us something interesting about your career. I love the fact about MIT and also that shipbuilding aspect, but anything else that is really interesting would be great to hear about you before we get into some more industry insights.


Jake Jurewicz: A lot of people sometimes say, really good founder-market fit, having grown up in the construction space. The problem with nuclear is really a construction problem, so I’ve gotten to really lean on a lot of my experience growing up, which is a huge passion of mine.


But actually, a couple other fun facts. You used to work for the government. I had a brief period of time working for the government in the intelligence community, working on some nuclear threat issues, which was an eye-opening experience. A lot of it I can’t get into, but it basically taught me I didn’t want to work for the government.


It also taught me that there’s this whole mechanism around nuclear nonproliferation internationally that’s really important and sits behind the scenes in the nuclear space. You met originally our team at the IAEA. The IAEA has a really important role in that.


That experience, that thinking, has really been woven into the DNA of Blue Energy as well, thinking about how it’s important for the U.S. and for the West to have a nuclear power product that we can export to U.S. allies and to countries around the world. Because if they’re not buying it from the U.S., they’re going to start buying it from the Russians and Chinese, and we’re really going to start to lose control of the ecosystem, the supply chain.


That’s a national security risk. It’s a geopolitical risk. It’s an economic risk that plays out over the course of decades.


Alex Krutz: I don’t think people fully appreciate the amount of intelligence and security even specifically around civil nuclear, what that is.


All right. Thinking of industry insight here, what would you tell people? What should they be talking about or not talking about? What’s an interesting fact in industry right now that you’re seeing and would be great to share?


Jake Jurewicz: What I’m observing, what our team’s observing as we’ve been engaging with a lot of the different players in the space, the hyperscalers, the data center developers, the utilities, the independent power producers, there’s been a massive shift in the energy economy.


When I was working at Exelon, most of the time we were fighting to keep the existing nuclear plants operating. It’s because we were only getting paid $25 a megawatt-hour for those plants, and we were shutting them down. There were multiple nuclear plants we announced shutdowns on. We were going to shut down two larger nuclear plants in Illinois at one point, Byron and Braidwood.


Then, in the course of two years or less, we saw this huge shift. Suddenly, the market woke up to the reality that, oh my God, we actually need generation capacity. Firm capacity matters. It’s not just megawatt-hours getting thrown off of wind and solar. We actually need firm capacity.


Now we’re paying to restart those very same nuclear plants for $120 an hour. Suddenly, you’re telling me that the value went up five times overnight. To me, that’s a market failure. It’s such a massive price dislocation to happen over such a short period of time.


What it’s taught me is that, particularly in the U.S., as an energy economy, as an energy market, we can be very myopic, very nearsighted, very short-term thinking. We’re just looking for power immediately. We want it today. We want it this year. Maybe, at most, we want it next year.


But the reality is, for making some of these important energy infrastructure decisions, you have to think a little bit further out so you set yourself up for having the most efficient, most cost-effective system.


Particularly the hyperscalers, the big conversation that’s popped up, you’ve seen all the big tech companies, all these LLM AI companies, showing up just consuming pretty much all the spare capacity that’s in the system. At this point, we’ve probably bought up all the spare capacity that exists between now and the end of the decade, 2030.


We’ve earmarked all the spare transmission capacity, increasing capacity factors at the existing generation units, buying up all the gas turbine manufacturing capacity, because that’s the closest thing we have to turnkey firm capacity we can just plop down and bolt to the earth.


Now that we’ve sold out essentially all that capacity, you’ve got to start looking to the next tranche of years, 2030, 2033. We’re starting to see conversations where we’ve got to seed the year to have new capacity sprout up, because we’ve been so short-term oriented. We’ve just bought everything that exists.


We now have to start making plans for how we make sure that the power is going to show up when we need it in the early 2030s, because we’re going to keep building. I think everybody’s waiting for the shoe to drop. The reality is we need so much new generation capacity, not just for AI, but for all the reshoring of industry that’s been going on, for really backfitting a lot of the old power plants that have been retiring, that were built during the last big wave.


Alex Krutz: The grid is aged, right? We’re going to need to do replacements, replacement energy. I think a lot of what you’re doing and the nuclear industry is really fascinating, and it’s really timely. I don’t think it’s appreciated enough how much of a national security and economic security issue that energy independence and leadership is for us.


Jake Jurewicz: We need it for water desalination. We’re having water crises in certain parts of the U.S. The reality is we just need so much power generation, and we’ve got to start making plans for how to get multiple gigawatts of generation capacity set up in really the next decade. I think it’ll be the next few decades that we’ll be building.


Alex Krutz: Let’s talk in a little bit more detail about your business. Let’s talk about your people. Obviously, in big companies, people are important everywhere. But really, when you think about startups and early-stage or mid-stage startups, where you fall in that life cycle, tell us about your team, your people, and how you see the growth of your business.


Jake Jurewicz: We’re only three years old, and we’ve grown to about 70 folks on our team. We’ve got offices in Washington, D.C., Houston, Texas. We’ve also got an engineering office in Scotland working with a nuclear shipyard out there.


The team is an interesting hybrid of industry veterans, people who have built nuclear plants around the world, in the Middle East, in the U.S., who’ve done big environmental permitting exercises for LNG plants and nuclear plants, who’ve done power generation development for some of the major independent power producers in the country.


There’s also a younger generation of some of the best engineers from companies like SpaceX, coming out of the best institutions around the world, around the U.S. in particular. That’s kind of the chocolate and peanut butter mix.


You want the right veteran expertise in power generation development because you need to be credible with all the stakeholders involved, the regulatory stakeholders, environmental permitting stakeholders, the government, but also the transmission and distribution utilities, the hyperscalers, the IPPs, the OEMs, the manufacturing, the fab yards in Louisiana and Texas.


Then you need that high energy, high horsepower, high intellectual capacity of the younger generation who can just outperform and surprise everybody to the upside. That is really what that startup DNA is all about, finding somebody who’s hungry and wants to put a dent in the universe.


Finding the right way to mix those two kinds of people is, I think, how you create a successful culture. It’s something we’ve spent a lot of time on. I really credit some of our early hires and my team with continuing to build that culture of A-plus individuals who make up this organization.


We’ve been able to attract some of the best talent from the LNG sector, from the Nuclear Regulatory Commission itself, from some of the biggest utilities, IPPs around the country, some of the big oil and gas supermajors, some of the best law firms, to join our team to really realize this vision. It’s exciting.


Alex Krutz: I can see the pieces for that chocolate and peanut butter. I could see that. That’s great.


Let’s talk a little bit about the product and technology here. If you want to explain a little bit more about how you fabricate in the spot, then how you deploy it, how it’s installed, and its end use and offtake, that might be really good. Maybe a little bit of the technology, which I think would be interesting for our listeners to know about, industrial gas turbines and then how that’s your segue. How do you create that path into that refined nuclear energy that you guys are bringing to the market?


Jake Jurewicz: There are two big innovations that Blue Energy brings to the market. One, this is the core of what we’re doing, is this large-format supermodule prefabrication approach brought to nuclear for the first time.


We’re taking things from the LNG and offshore oil and gas sector, where we’re building these big thousand-ton modules, mechanical, electrical, plumbing outfitted. In some cases, we can pretest and commission things offsite before we barge it over to our operating sites.


We roll them off with these things called SPMTs, which are basically these robotic Roombas. I’ll call them industrial Roombas that can lift arbitrarily heavy things. It’s a bunch of hydraulic robots that come under. You can daisy-chain as many of them together as you want. They have 360-degree wheels, and you can lift these big thousand- or 2,000-ton modules and just roll them right off the barge onto the site and drop them down.


You can make connections like a Formula One team, just making pipe connections, electrical connections. It’s much faster, and it totally changes the way you think of building large industrial infrastructure. That is the core of what we’re doing.


Then there’s a second innovation we developed to further de-risk and accelerate the deployment of power, and that is a gas-to-nuclear technology. What we’re doing is we’re actually building a nuclear steam turbine first.


We’re building the whole nuclear balance of plant, steam turbine, condenser, generator, switchyard, interconnection, cooling towers. Then we are energizing it early with two combustion turbines that we’ve secured from GE Vernova, our partners. As you mentioned, we’ve signed a big partnership with GE Vernova and GE Vernova Hitachi on both the nuclear equipment and the gas equipment.


We’re going to be building half of a BWRX-300 right away, energizing it early with two combustion turbines. It begins life as a two-on-one combined-cycle natural gas plant, which allows us to accelerate the delivery of power by years, but also reduce the cost of capital in financing that first nuclear small modular reactor, because we’re able to use the cost of capital of a gas plant rather than the cost of capital of a nuclear plant.


Then we are building the nuclear island right next to that operating steam turbine, and then we’re switching the steam lines over. We’ve got a whole process approach to how to do this that we’ve been reviewing with the Nuclear Regulatory Commission. We’ve gotten approval from them on a methodology for this through a topical report. That allows us to switch from gas steam to nuclear steam.


Then we go full nuclear steam, and we switch the gas turbines over to simple-cycle mode. They’re still continuing to operate as additional dispatchable, flexible firm capacity.


The combination of those two things together is presenting, we think, the fastest and best way to de-risk new nuclear capacity in the country and really meet the moment for delivering power that the AI build needs, as well as the other industrial needs.


Alex Krutz: Do you see your product going more for hyperscalers or other data centers or federal lands? Now that you’re really getting into the thick of it, where do you see deployment of SMRs in the coming years primarily?


Jake Jurewicz: I would say all of the above. The hyperscalers, the data centers, represent a good beachhead market for us because there’s so much power demand there, and it’s really concentrated power demand. They’re building a lot of generation capacity right now.


But what we’re offering, and I think what we’re seeing, is there’s a strategic need for nuclear because it brings firm capacity and it hedges a lot of the gas risk that they’re taking on with all the gas that they’re building, because it’s a diverse fuel source. Nuclear runs when there’s an interruption in gas supply, which occasionally happens. A polar vortex comes ripping down from Canada and hits the Midwest. It hedges any regulatory risk on the gas turbines.


We’re targeting the hyperscalers in the short term, but we’re also in conversations with federal lands. We’ve had early conversations with some defense facilities. We’re also in conversations with other major industrial ports and manufacturing and oil and chemical hubs.


The way we’re thinking of it is we need that beachhead customer to get that first one done. You pay a higher cost of capital. There’s always risk on the first build. We build that first one at a slightly higher price of power.


As we start to demonstrate this manufacturing approach and we build out the supply chain, we can drive down that cost of power where it can start to serve the more price-sensitive loads, like the industrial loads down in South Texas, Louisiana.


Alex Krutz: Can you talk a little bit about where that first site or first opportunity is, or is that still secret squirrel for you guys?


Jake Jurewicz: We’re in conversations with a number of sites, mostly focused, I would say, east of the Rockies, around the Mississippi River, Ohio River, Illinois River. Anywhere you’re barging coal into the Midwest, through the Great Lakes, is a site that we can target.


Our first public site is down in the Port of Victoria, Texas. It’s a site we’re excited about. We’re developing it. It still has a number of milestones to go through before we call it final investment decision to greenlight the project, but we’re excited about the potential for that site. There are a number of other sites around South Texas, South Louisiana.


Alex Krutz: Yesterday, for a client, I was in Texas doing some industrial work. There’s a lot of growth and a lot of opportunity there. I think you’re picking potentially a good place to do some work.


As we exit product and technology, one of the things that’s really interesting for me that you stated earlier was your maritime, your shipbuilding background, and also with nuclear. We know that there is some proven technology because the military uses it for nuclear-powered maritime.


I’m interested in your take on the growing acceptance and need for our maritime dominance that the president signed as an executive order, to rebuild our shipbuilding industry. Now the Department of Transportation is really thinking about power generation and civil nuclear with that. Can you give a couple thoughts on where you think that might be going and the differentiator of that in the marketplace?


Jake Jurewicz: This is where that national security experience got woven into the thinking for this company. Everything we’re doing to do this fab-yard and shipyard build for civil nuclear is dual use with defense nuclear applications. We have needed for a long time to build out a deeper supply chain network and workforce for the nuclear submarines, aircraft carriers, other future potential nuclear Navy capabilities that we want to build out.


Some of the things that we’re looking to do to help harden, build out, and qualify some of these facilities, they can very quickly turn around and help serve our Navy, which I think is of increasing strategic importance as China builds out its navy and we start to deploy more nuclear subs around the Southeast Asian region.


One of the main opportunities we see is to leverage, we’re already working with and we’ve been talking from the earliest days with some of the qualified nuclear sub shipyards, fabricators, not just in the U.S., also in other parts of the world, like here in Scotland, locations that already serve the U.S. Navy and Royal Navy for nuclear subs.


It’s near and dear to my heart. It’s really important. I think it’s an important area that hasn’t gotten enough attention for many years, and it’s starting to get more attention.


Alex Krutz: It is. It’s super exciting. Into the last discussion point here, being on the forefront of construction and new technology and energy, let’s talk industrial policy.


How do you see industrialization, the industrial base, the reshoring efforts into the U.S., things that maybe had disappeared over the years and that are now starting to reappear, at least discussions? It would be great to get your perspectives on where you see that, jobs, factories, and even exports.


Jake Jurewicz: It’s funny, I’ve been thinking about this question for a while. I don’t remember where I first heard this line of thinking, but it resonates with me so much.


When I was working at Exelon, it’s one of the biggest utilities in the U.S., we always talked about flat load growth for 25 years. I always wondered, why is load growth so flat? Why isn’t electricity growth growing?


We always used to credit it to energy efficiency upgrades, like switching from incandescent light bulbs to LED light bulbs, more efficient refrigerators. It was some of that, but it was also the combination of that with offshoring a lot of industry that we were doing. It was kind of a national policy, effectively, for a couple decades, where it just led to stagnant load growth.


Because it was stagnant load growth for so long, we started to implement a number of environmental and NIMBYism regulations that really just made it harder. It calcified our infrastructure. It’s become harder to build new power plants, harder to build new transmission, harder to build new factories, because we just thought we didn’t need them, because we weren’t seeing the demand pull for them for so long.


We got complacent and thought, oh, this is just the new normal. A developed nation just doesn’t have load growth anymore like a developing nation.


Then you’ve started to see this shift of, actually, we need to reshore for national security reasons, for economic growth reasons. I think we had to remind ourselves, and maybe the biggest thing that AI has reminded us of, is that we are going to keep inventing ways to consume a lot more power.


It’s AI today, but it’ll be synthetic fuels or, like I said, water desalination or something else in the future. We’re going to keep inventing ways that improve our standard of living, that consume more power and create the new products of the future that really drive our economy forward.


I think what we realized is, oh, we can’t actually energy-efficiency our way out of this problem. We actually need to build a lot more power capacity. We do have to rethink strategically where it’s appropriate, where it’s not appropriate, to build industrial capacity, particularly within the borders of our country.


The price of power is a really important ingredient to that, to make sure that we are cost competitive in manufacturing things. It means we have to lean a lot more into industrial automation and our manufacturing approaches. It means you need to take a little bit more of an integrated approach to where we’re going to build, where the industrial hubs are that are going to make sense, because you need key feedstocks. Usually electricity and water are two of the big ones for any major manufacturing industrial operation.


How do we think about building out those hubs? How do you bring firm capacity to those locations? Data centers are really just, I think, the catalyst of the moment right now.


Alex Krutz: The catalyst.


Jake Jurewicz: What you need for data centers isn’t dissimilar to what you need for a refinery expansion or chemical plant or other manufacturing industrial buildup. It’s taking up a lot of the oxygen in the room right now. But I think the playbooks that we’re developing and some of the regulatory and permitting reform that is getting forced through this economic boom we’re having right now is going to pay dividends with other industrial buildouts that we need to do.


Alex Krutz: I think that’s a great place to summarize. Industrial capacity needs highly efficient and cost-effective energy. That’s, at the end of the day, what is necessary for our industrial policy and competitiveness in the global environment.


Jake Jurewicz: It’s throttling the European economy, and you’re seeing this right now. Going back to what inspired me to start the company was seeing what happened to Germany’s economy when it lost Russian gas.


The entire German economy, which was a manufacturing economy, was really just assuming that it would have cheap natural gas from Russia. Once that disappeared, it has completely upended their economy, because the price of energy really is the first 5% of GDP. It affects everything.


I think it’s just very shortsighted for any country to not think about how you achieve domestic energy security and a form of energy sovereignty. Because without energy sovereignty, you don’t have economic sovereignty, and ultimately you don’t have geopolitical sovereignty.


Alex Krutz: I think that’s a great way to think of it, sovereignty’s life cycle and how energy plays a part in there.


Jake, if our listeners want to get in touch with you or share something, is there a good method for them to get in touch with you or the team or the firm if they’re interested in what they heard here?


Jake Jurewicz: LinkedIn. LinkedIn’s actually a good venue for me and for the company. I think our website, blueenergy.co, also has a way to get in touch with our team.


Alex Krutz: That would be great. Jake, I really appreciate this energetic conversation. No pun intended. Really appreciate talking with you today. Like I said at the beginning, it was great to get to know you and your team last year and this year. I think you guys and gals are doing fantastic stuff.


Really wish you the best of luck, and I’m rooting for you guys from the sidelines here. Really appreciate it, Jake Jurewicz from Blue Energy. Thanks for coming on The Factory Doctor podcast today.


Jake Jurewicz: Thank you. Really appreciate the time.

 
 
 

Comments


Patriot Industrial Partners Inc.

Patriot Industrial Partners, Inc.

65 Enterprise Drive, Suite 400

Aliso Viejo, CA 92656​

© 2026 by Patriot Industrial Partners, Inc.

Connect With Us

LinkedIn Logo
YouTube Logo
X Logo

Contact

bottom of page